供销东路(昌盛路至中兴路段)道路工程为城市支路,起于昌盛路,止于中兴路,道路长 380m,道路为双向两车道,红线宽 20m,设计速度 20km/h,为水泥混凝土路面。
The Gongxiao East Road (Changsheng Road to Zhongxing Road Section) project is an urban branch road starting from Changsheng Road and ending at Zhongxing Road. The road is 380 meters long, with two-way two lanes, a red line width of 20 meters, a design speed of 20 km/h, and a cement concrete pavement.
东风路东延线道路工程为城市支路,起于昌盛路,止于部队南侧,道路长 1080m,道路为双向四车道,红线宽 50m,设计速度 40km/h,为水泥混凝土路面。
The Dongfeng Road East Extension Project is an urban branch road starting from Changsheng Road and ending at the south side of the military compound. The road is 1,080 meters long, with two-way four lanes, a red line width of 50 meters, a design speed of 40 km/h, and a cement concrete pavement.
合作设计项目,红沙污水处理厂设计规模为8万吨/日,中水回用2万吨/日。出水水质达到国家GB18918-2002一级A标准,将6万吨/日的净化出水排海,2万吨/日的净化出水送入三亚市城市绿化回用水管网回用。
Cooperative design project. The Hongsha Sewage Treatment Plant has a designed treatment capacity of 80,000 tons per day, with 20,000 tons per day of reclaimed water reuse. The effluent quality meets the national Grade A standard of GB18918-2002. Among them, 60,000 tons per day of purified effluent is discharged into the sea, and 20,000 tons per day of purified effluent is sent to Sanya's urban greening reclaimed water pipeline network for reuse.
设计规模一期2.5万吨/日,二期5万吨/日,本工程主要供水范围包括:屯城镇、西昌镇、坡心镇、晨星农场部分连队、中建农场部分连队、雨水岭生态公园等三个镇区及两个农场。2020年总人口167573人,其中屯昌县城118003人,农村人口为49570人。
The design scale is 25,000 tons per day for the first phase and 50,000 tons per day for the second phase. The main water supply scope of this project includes: Tunchang Town, Xichang Town, Poxin Town, some companies of Chenxing Farm, some companies of Zhongjian Farm, Yushuiling Ecological Park, etc., covering three town areas and two farms. In 2020, the total population was 167,573, among which the population of Tunchang County seat was 118,003 and the rural population was 49,573.